Single Window Replacement Timeline
- Assessment & Measurements: 15–20 minutes
- Removal of Old Window: 20–30 minutes
- Installation of New Window: 30–40 minutes
- Caulking, Cleanup, Testing: 10–15 minutes
- Total: 1.5–2 hours per window
Multi-Window Projects (5–10 Windows)
If you’re replacing 5–10 windows, our team works efficiently: Day 1: Removal of all old windows, frame prep, installation of 3–4 new windows, weatherstripping. Day 2: Install remaining windows, caulk, test seals. Day 3 (if needed): Touch-ups, final cleanup, inspection.
Most homeowners see their project completed in 2–3 days.
Full-Home Window Replacement (15+ Windows)
A complete home renovation might take 4–6 working days, depending on: Number of windows. Frame condition. Whether you need frame repair. Weather delays.
Factors That Extend Timeline
- Frame Damage: If the existing frame is rotted, we may need to rebuild it (+1–2 hours per window)
- Weather: Extreme heat, cold, or rain may delay installation
- Hidden Issues: Once we remove the old window, we sometimes discover water damage or settling
- Custom Sizes: Non-standard window sizes require custom framing (+30 minutes per window)
Real Example: Ballantyne Home
A Ballantyne homeowner replaced 12 windows. Day 1 and Day 2 saw 6 windows installed each. On Day 3, we did final caulking and testing. Project complete by Friday afternoon.